Sunset Crossing — Mixed-Use Retail Center

Lifestyle center with anchor cinema, food hall, and 18 in-line tenants opened on time and 14% under GMP.

On-time vs. anchor lease (-2 days)
Schedule
14% under GMP
Cost
18 / 18 at grand open
Tenants ready
0 OSHA recordables
Safety
Challenge

The brief

Anchor cinema lease required a non-negotiable opening date with seven coordinated tenant fits and brownfield site work.

Approach

How we ran it

  1. 01Owner-side PM engaged at feasibility to instrument the schedule against the anchor lease date.
  2. 02Trade-coordinated procurement strategy unlocked early steel and switchgear releases.
  3. 03Tenant coordination playbook tied every TI deliverable to the anchor calendar.
Outcome

What we delivered

Schedule
On-time vs. anchor lease (-2 days)
Cost
14% under GMP
Tenants ready
18 / 18 at grand open
Safety
0 OSHA recordables

"Their grip on the anchor calendar saved the deal. We've handed them three more projects."